Robot system
Robot system - Overseas
◀ touch and drag ▶
| No. | Title of the construction | Owner | construction period |
|---|---|---|---|
| 8 | BHMC3 CN7c robot gripper FLR construction method change | HMC Beijing | 2019 |
| 7 | BHMC3 DU2 robot gripper | BHMC3 Beijing | 2019 |
| 6 | BHMC3 TMc robot gripper & modification | BHMC3 Beijing | 2019 |
| 5 | HMMA BB/MOVING line robot gripper | HMMA Alabama | 2018 |
| 4 | BHMC #5 GLASS DG & Seat robot equipment | BHMC#5 Beijing | 2016 |
| 3 | BHMC #4 GLASS DG & Seat robot equipment | BHMC#4 Beijing | 2016 |
| 2 | RR GLASS LOADING ROBOT SYSTEM | Hyundai Motors Czech | 2014 |
| 1 | FRONT GRASS INPUT ROBOT SYSTEM | Hyundai Motors Czech | 2013 |


